Service Details
- Home
- Service Details
The preshipment inspections for routers will verify if they work properly and the order/ product specifications are met:
Normally for this kind of QC check inspections of routers, it would be final inspections, but we also have:
An example of router onsite quality inspections fyi:
INSPECTION LIST | COMMENTS | RESULT |
---|---|---|
Take snapshots of ALL pallets and of the Products in the show room | PASSED | |
Perform a function test. All inspection procedures and specifications will according to client's requirement included: golden sample, packing requirement, Product specification, Inspection Protocol, Instruction manual, etc a. Power on/off test 5 times; b. LED/LCD/VFD display and LED indicator check; c. All input/output socket function |
PASSED | |
Internal workmanship check | FAILED | |
S/N for the inspected sample are written down in the our report - b.2 Capture images and record S/N of the faulty products for solving them |
N/A | |
Perform quantity and assortment check for all component (S2) | N/A | |
Product internal visual inspection - f.1 Indoor cleaning. Once the DUT is opened, the inspector has to check the board - f.2 The inspector has to check the board components - f.3 Board labeling. - f.4 Screws. The inspector will review the screwing of the sample |
PASSED | |
- c.1 Colors, sizes and weights matches the criteria defined - c.2 CD shows Teldat artwork when box is opened. It is shipped in a paper bag. CD has no visible scratch on any side. - c.3 Documents are neatly printed. Margins are OK. Paper has no marks, no dirt and they are not broken. |
PASSED | |
Perform hi-pot test if applicable | PASSED | |
Test DUT following the document. Inspector requires the herein material specified. During Test, inspector is asked to check leds. These must light perfectly. Every DUT must use their own power supply and antennas. Plastic cover has to be placed on DUT |
FAILED | |
Check colors, sizes, weight, logo, CD and documents only on ONE product - c.1 Check colors, sizes, weight, logo - c.2 Check CD - c.3 Check Packing List and Disclaimer |
FAILED | |
Perform wobble test, put the unit on the flat surface ,the unit should not tip or wobble during the test | PASSED | |
The DUT passes the test. If something is wrong it is recommended to turn-off the DUT and to repeat the test again. | PASSED | |
Collect report data. Once finished all the tests and validations the inspector has to send the Test recorded data to Teldat. Test Result Recording issue is documented in Testing.pdf | PASSED | |
Perform remote control test -check the distance for the remote(S2) | N/A | |
Record data of the inspected sample - b.1 Write down in the report S/N of the inspected sample. - b.2 Take snapshots of the defects detected |
FAILED | |
Error must be documented with snapshots. S/N must be recorded | N/A |
Router 3rd party inspection, Router 3rd party inspection in China, Router 3rd party inspection services in China, China Router third party inspection, Router third party inspection in China, Router inspection in China, China Router 3rd party inspection, Router third party inspection services, Router inspection services in China, China Router third party inspection services, China Router inspection, Router third party inspection, Router third party inspection services in China, China Router 3rd party inspection services, Router 3rd party inspection services, China Router inspection services, Router inspection services
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.