Service Details
- Home
- Service Details
We offer onsite quality QC check inspection services to baking ovens, gas stoves, furnaces and other cooking kitchen equipment. The inline check methods will be:
INSPECTION CHECKPOINTS | RESULTS | COMMENTS |
---|---|---|
Packaging, safety and drop tests onsite | NOT OK | |
Product specs, and special requirements check | NOT OK | |
Quantity & assortment verifying | OK | |
On-site safety, regulation & function testing | OK | |
Measurements & sizes check | N/A | |
Aesthetic, visual defects, workmanship, surface and function inspection | OK | |
Labels, markings, logos & barcodes quality check | OK |
Below are some of the common types of pre-shipment inspection for ovens, furnace, stoves etc.:
A common checklist for quality onsite inspection for ovens:
INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Check the temperature at the minimum and maximum settings.-S1 Record the actual results |
FAILED | |
Perform a Hi-pot test.-II According to UL2111 or EN60335-1: UL2111 - Less than 250v operated motors 0.5hp or less->1000V for 60S. - More than 250V operated motors or more than 0.5HP->1000+2Va for 60S EN60335-1 For less than 250V operated motors 1250/1750/3000V for60s according to the insulation (basic, supplementary, reinforced.) Take clear pictures for following information: AC/DC socket, Requested voltage and calibration label |
PASSED | |
Perform a microwave radiation emission test.-II The result should be less than 5mw/cm2 at any point 5mm from microwave. |
N/A | |
Perform a stability test -S2 Perform the test on a surface inclined 10 degrees. please take clear picture to show that the product is in the most unfavourable position on the inclined plane. |
PASSED | |
Test all detailed functions according the instruction manual of the item's box.-II | FAILED | |
Perform a pull test for power cord-S1 pull on the cord for 25time in 1 minute. If the product has a net weight=1kg, use a force of 30N. If the product has a net weight 1kg>, =4kgs, use a force of 60N, If the product has a net weight >4kgs, use a force of 100N- The cord should not be displaced more than 2mm. Noted: Before starting the test, you should pull the cord several times to make sure that no rolled cord inside the product. |
PASSED | |
Perform an earth continuity test if applicable. -II The result of test should be <0.1ohm. |
PASSED | |
Perform an internal check.-S1 According to the BOM provided by client. a/ take all related picture to show each main component and prepare a list of them. b/ Check and show the quality of welding. c/ If the earth pin or any pin is not cinnected to wire; fail the test and put important remark. |
PASSED | |
Test the function of the turntray, if test model has a turntray.-II | PASSED | |
Check the power usage (ie.: wattage).-S2 | N/A | |
Perform a life/endurance test for functions other than microwave.-S1 No overheating or other problem observed. |
N/A | |
Check the design of product to see effect.-S1 If the door is open, the magnetron can't work. |
PASSED | |
Perform a fatigue test for door and all adjustable parts.-S2 20 movements |
PASSED |
oven quality control services, oven third party quality control services, China oven quality control, oven third party quality control in China, China oven 3rd party quality control, oven quality control in China, oven quality control services in China, oven third party quality control, China oven third party quality control services, China oven 3rd party quality control services, oven third party quality control services in China, oven 3rd party quality control, oven 3rd party quality control services
3rd party preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check assurance inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.