Service Details

  • Home
  • Service Details

WIFI router shipment inspection:


The preshipment inspections for routers will verify if they work properly and the order/ product specifications are met:

  • Packaging, safety and drop tests onsite
  • Quantity & assortment verifying
  • On-site safety, regulation & function tests
  • Aesthetic, visual defects, workmanship, surface and function inspections
  • Product specs, and special requirements checks
  • Measurements & sizes inspections
  • Labels, markings, logos & barcodes QC inspections

Normally for this kind of QC check inspections of routers, it would be final inspections, but we also have:

WIFI router shipment inspection

An example of router onsite quality inspections fyi:

ONSITE INSPECTION CHECK LIST COMMENTS RESULT
The DUT passes the test. If something is wrong it is recommended to turn-off the DUT and to repeat the test again. PASSED
Perform wobble test, put the unit on the flat surface ,the unit should not tip or wobble during the test PASSED
Perform hi-pot test if applicable PASSED
- c.1 Colors, sizes and weights matches the criteria defined
- c.2 CD shows Teldat artwork when box is opened. It is shipped in a paper bag. CD has no visible scratch on any side.
- c.3 Documents are neatly printed. Margins are OK. Paper has no marks, no dirt and they are not broken.
PASSED
Error must be documented with snapshots. S/N must be recorded N/A
Perform remote control test -check the distance for the remote(S2) PASSED
Check colors, sizes, weight, logo, CD and documents only on ONE product
- c.1 Check colors, sizes, weight, logo
- c.2 Check CD
- c.3 Check Packing List and Disclaimer
PASSED
Perform a function test.
All inspection procedures and specifications will according to client's requirement included: golden sample, packing requirement, Product specification, Inspection Protocol, Instruction manual, etc a. Power on/off test 5 times; b. LED/LCD/VFD display and LED indicator check; c. All input/output socket function
N/A
Product internal visual inspection
- f.1 Indoor cleaning. Once the DUT is opened, the inspector has to check the board
- f.2 The inspector has to check the board components
- f.3 Board labeling.
- f.4 Screws. The inspector will review the screwing of the sample
PASSED
Perform quantity and assortment check for all component (S2) PASSED
Record data of the inspected sample
- b.1 Write down in the report S/N of the inspected sample.
- b.2 Take snapshots of the defects detected
PASSED
S/N for the inspected sample are written down in the our report
- b.2 Capture images and record S/N of the faulty products for solving them
PASSED
Test DUT following the document. Inspector requires the herein material specified.
During Test, inspector is asked to check leds. These must light perfectly. Every DUT must use their own power supply and antennas.
Plastic cover has to be placed on DUT
FAILED
Take snapshots of ALL pallets and of the Products in the show room PASSED
Internal workmanship check PASSED
Collect report data. Once finished all the tests and validations the inspector has to send the Test recorded data to Teldat. Test Result Recording issue is documented in Testing.pdf PASSED

3rd party pre products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre- QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x