There are below on-site in-line quality check procedures for the electric tool inspections:
An example of the third party inspections for electric tools:
INSPECTION CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. | PASSED | |
Perform a normal function test. .-II | PASSED | |
Disc Size(打磨刀片尺寸) | PASSED | |
Perform the standard power test-II. | PASSED | |
Serial no(此批产品的序列号) | PASSED | |
Perform an assembly test. | PASSED | |
No load speed:(额定电压的空载转度)—S2 | FAILED | |
Smell check-check if there are any strong offensive odor-II | PASSED | |
Check if the base of the item wobbles by placing it on a flat, glass surface--II | PASSED | |
Power consumption test-The voltage input should be the same as rating voltage in rating label, otherwise the result of power consumption will not be accurate--II |
PASSED | |
Perform an internal check.- Internal check: take a photo to show all that the item contains All the components specified by the client. need to write down the marking on all critical components-All Internal wiring should be routed to provide sufficient creep age and clearance distances and to so as to avoid damage to the insulation. All screws should be found, they should be fully tightened and with no damage to the screw heads. request at least one picture to show the whole construction of product-S1 |
PASSED | |
Perform a strength check.-Test all connections using normal force.-II | FAILED | |
Pull testing(60N) for Power cord test. -S2 | FAILED | |
Perform a voltage range test -II (额定电压的+-10%) | FAILED | |
Run the test work for 4 hour ----S2 | PASSED | |
Perform a fatigue test for all adjustable parts: Do this 20 times for assemble and sand paper on tool head – There should be no damage to the item. ----S2 |
PASSED | |
For 3M tape adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 | PASSED | |
Leakage current test--II | N/A | |
.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) The Carton should fall down At 61cm height without damage-S1 |
PASSED | |
Perform a Hi-pot testing -II | FAILED | |
Other test | PASSED | |
perform quantity and assortment check in each package--S1 | FAILED | |
PLUG& Power Cord view-S2 | PASSED | |
Power cable Size 4m for all item-S2 | PASSED | |
Perform a barcode –scanning test .The barcode should be scannable and have the correct number for all barcode label. (-S3) | PASSED | |
Application testing and Real function test-S1 | PASSED |
China electric tool 3rd party inspection, electric tool third party inspection services, electric tool third party inspection services, electric tool third party inspection services in China, electric tool 3rd party inspection services in China, China electric tool third party inspection services, China electric tool 3rd party inspection services, electric tool third party inspection in China, electric tool third party inspection, electric tool 3rd party inspection, electric tool third party inspection services in China, China electric tool third party inspection, electric tool third party inspection in China, China electric tool third party inspection, China electric tool third party inspection services, electric tool 3rd party inspection services, electric tool 3rd party inspection in China