Service Details
- Home
- Service Details
There are below on-site in-line quality check procedures for the electric tool inspections:
An example of the third party inspections for electric tools:
CHECK LIST | COMMENTS | RESULT |
---|---|---|
Perform a Hi-pot testing -II | FAILED | |
Smell check-check if there are any strong offensive odor-II | PASSED | |
perform quantity and assortment check in each package--S1 | N/A | |
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. | PASSED | |
.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) The Carton should fall down At 61cm height without damage-S1 |
PASSED | |
Application testing and Real function test-S1 | PASSED | |
Perform an internal check.- Internal check: take a photo to show all that the item contains All the components specified by the client. need to write down the marking on all critical components-All Internal wiring should be routed to provide sufficient creep age and clearance distances and to so as to avoid damage to the insulation. All screws should be found, they should be fully tightened and with no damage to the screw heads. request at least one picture to show the whole construction of product-S1 |
N/A | |
Run the test work for 4 hour ----S2 | N/A | |
Pull testing(60N) for Power cord test. -S2 | PASSED | |
Perform a voltage range test -II (额定电压的+-10%) | N/A | |
Leakage current test--II | PASSED | |
Perform a strength check.-Test all connections using normal force.-II | N/A | |
Perform the standard power test-II. | PASSED | |
Perform an assembly test. | PASSED | |
Other test | PASSED | |
For 3M tape adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 | FAILED | |
Serial no(此批产品的序列号) | N/A | |
Perform a normal function test. .-II | PASSED | |
Power consumption test-The voltage input should be the same as rating voltage in rating label, otherwise the result of power consumption will not be accurate--II |
PASSED | |
PLUG& Power Cord view-S2 | N/A | |
Perform a barcode –scanning test .The barcode should be scannable and have the correct number for all barcode label. (-S3) | FAILED | |
Disc Size(打磨刀片尺寸) | PASSED | |
Perform a fatigue test for all adjustable parts: Do this 20 times for assemble and sand paper on tool head – There should be no damage to the item. ----S2 |
FAILED | |
Power cable Size 4m for all item-S2 | FAILED | |
No load speed:(额定电压的空载转度)—S2 | PASSED | |
Check if the base of the item wobbles by placing it on a flat, glass surface--II | N/A |
electric tool 3rd party factory Check services in China, electric tool 3rd party factory Check, China electric tool 3rd party factory Check services, China electric tool third party factory Check, electric tool factory Check services, China electric tool 3rd party factory Check, China electric tool third party factory Check services, electric tool 3rd party factory Check services, electric tool factory Check in China, electric tool third party factory Check, electric tool factory Check services in China, electric tool third party factory Check services, China electric tool factory Check services, electric tool 3rd party factory Check in China, electric tool third party factory Check services in China, electric tool third party factory Check in China, China electric tool factory Check
3rd party preshipment products goods onsite inline final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC quality control assurance inspection services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.