Service Details

  • Home
  • Service Details

Fitting 3rd party inspection:


For fitting QC checks, the inspection will mostly focuses on size checks to make sure all measurements are within tolerances. the inspections for fittings have below types:

The pre-shipment inspections for fittings include below checks too:

INSPECTION CHECKPOINTS RESULTS COMMENTS
A. Quantity check OK
B. Shipping marks & packing OK
C. Labels, logos and colors NOT OK
D. Styles & measurements OK
E. Onsite safety and function tests OK
F. Special requirements OK
G. AQL workmanship
(Visual inspections)
OK
fitting 3rd party inspection

Please find below for a fitting quality inspection checkpoints for reference:

ON-SITE CHECK LIST COMMENTS RESULT
Barcode scanning for both bags and cartons.take picture of all carton and bag label ofproducts, two pcs for each item at least N/A
Please, check that ALL boxes have the importer sticker refer to the attachment PASSED
Check that the SKU the carton label indicates, corresponds to the product inside – level II PASSED
Electric galvanized finish. Surface should have a homogeneous coat of galvanization. PASSED
Perform adhesive test on galvanization. Galv.coat should not come off. You can use stout knife to detect. 1 pcs per item PASSED
Check that labels in cartons are placed right side up on the boxes. Please, take picture PASSED
check that number of pieces that the carton label reads, corresponds to the actual number of pieces packed. – level II FAILED
Check weights as per attached file (only for the items highlighted in yellow). Check 5 pcs per item and record the 5 result one by one. PASSED
Check the carton design refer to the attachment FAILED
Assembly and fitting test 1pcs per item PASSED
Inspect the quality of the fittings thread. Please, use a galvanized plug with perfect thread for all references detailed refer to the attachment The screwing process must be smooth. Threads cannot be broken 1pc per item FAILED
Check that total quantity per SKU matches to the attachment PASSED
Both cartons and bags should have labels.Absent of a label will be considered as defect-level II FAILED
Check for absence of fittings description debossed on the piece itself. For example,galvanized tee 1/2 inch must be embossed on the body (1/2). Lack of this should be considered as a defect. Level II PASSED

preshipment products goods factory onsite inline final Random AQL PSI TPI FRI DUPRO third on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x