Service Details

  • Home
  • Service Details

Power tool inline inspection:


The Product Quality Pre-shipment Inspections for Power Tools, Power Drills, Cement Mixers, Concrete Cutters, Glass Cutters, Grinders, Hammers, Polishers, and Hammers etc.:

How to do Quality Pre-shipment Inspections for Power Tools?

INSPECTION CHECKPOINTS RESULTS COMMENTS
Packaging, safety and drop tests onsite OK
Quantity & assortment checks OK
Labels, markings, logos & barcodes quality check OK
Aesthetic, visual defects, workmanship, surface and function inspections OK
Product specs, and special requirements inspections NOT OK
On-site safety, regulation & function tests OK
Measurements & sizes inspections OK

The onsite quality check for power tools we have:

power tool inline inspection
CHECK LIST COMMENTS RESULT
E1.Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) Passed
E2.Smell check-check if there are any strong offensive odor-II Passed
E3.For adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 Passed
E4.Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, after drying, for a further 15 s with a piece of cloth soaked with petroleum spirit; if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. Passed
E5.Check if the base of the item wobbles by placing it on a flat, glass surface--II Passed
E6.perform quantity and assortment check in each package--S3 Passed
E7.Perform a strength check.-Test all connections using normal force.-II N/A
E8.Perform a humidity test on solid wood and MDF parts with wood humidity tester(brand name: testo), Please fill the detail finding table for wood humidity test. The sample should be taken: - On S3; - In at least 10 different cartons - Provide at least 1 picture for each measurement point position (to show where the test was done = 3 pictures totaly)-Check the humidity for wood: check 3 points(a, b and c) per unit- For wooden items, the humidity tolerance for April to October: 12% Max -II Passed/td>
E9.Perform a fatigue test on all adjustable parts.--S2 Passed
E10.Check all the accessories with the item.--S2 Passed
E11.Perform an assembly check.--II N/A
E12.Perform a Hi-pot testing -II Passed
E13.Perform a voltage range test -II Passed
E14.Perform the standard power test-II Passed
E15.Function test : --II Passed
E16.Run the test work for 4 hour ----S2 Passed
E17.Leakage current test--II Passed
E18.Perform an internal check.-Take all related pictures to show special requirements.-S1 (5 Pcs) Failed
E19.Perform a life test.-Continue to run this test during the whole inspection period.-S1 (5 Pcs) Failed

3rd party preshipment products goods factory onsite final Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x