Service Details

  • Home
  • Service Details

Household appliance final inspection:


For household appliance 3rd party inspections, the inspector will check thoroughly the shipment as per below:

  1. Quantity Inspection/Check
  2. Packing Inspections: assortment, carton sealing, tapings, shipping marks, gift boxes and wrappings etc.
  3. Labels, SKUs, Barcodes, Logos
  4. Measurements, Sizes, Weights
  5. Colours, Assemblies
  6. Function & Safety On-site Testing
  7. Visual Defects: Critical Defects, Major Defects, Minor Defects
  8. Special requirements & attentions etc.
household appliance final inspection

CHECK LIST COMMENTS RESULT
Perform a carton drop test on the export cartons:10 times(1 corner 3 edges 6 faces) Passed
Smell check-check if there are any strong offensive odor-II Passed
For adhesive test: perform test on coating (painting/plating/ screen printing, etc) with 3M tape.-S2 Passed
Perform a rub test for printing and marking ; Adhesive test for coating if applicable-For rub test: The durability of the marking is checked by trying to remove it by rubbing lightly for 15 s with a piece of cloth soaked with water and, if the spirit not availabel, use the 95% alcohol - After the test, the marking shall be legible, marking labels shall not be easily removable andthey shall show no curling. N/A
Check if the base of the item wobbles by placing it on a flat, glass surface--II N/A
perform quantity and assortment check in each package--S3 N/A
Perform a strength check.-Test all connections using normal force.-II N/A
Perform a humidity test on solid wood and MDF parts with wood humidity tester(brand name: testo), Please fill the detail finding table for wood humidity test. The sample should be taken: - On S3; -Check the humidity for wood: check 3 points(a, b and c) per unit- For wooden items, the humidity tolerance for April to October: 12% Max -II N/A
Perform a fatigue test on all adjustable parts.--S2 N/A
Check all the accessories with the item.--S2 N/A
Perform an assembly check.--II N/A
Perform a Hi-pot testing -II N/A
Perform a voltage range test -II N/A
Perform the standard power test-II N/A
Function test : --II N/A
Run the test work for 4 hour ----S2 N/A
Leakage current test--II N/A
Perform an internal check.-Take all related pictures to show special requirements.-S1 (5 Pcs) Failed
Perform a life test.-Continue to run this test during the whole inspection period.-S1 (5 Pcs) Failed

3rd party preshipment products goods factory onsite inline Random AQL PSI TPI FRI DUPRO third party on-site in-line pre-shipment QA QC check quality control assurance services in China India Vietnam Thailand Malaysia Bangladesh Taiwan.

 

Menu
x